Aller au contenu principal

Sigrow Soil Pro + Assembly

Ce dont vous avez besoin

  1. Sigrow Soil Pro + Assembly, Gather materials: étape 1, image 1 de 3 Sigrow Soil Pro + Assembly, Gather materials: étape 1, image 2 de 3 Sigrow Soil Pro + Assembly, Gather materials: étape 1, image 3 de 3
    • PCB RR02 or higher 'coated

    • Sigrow Soil Sensor

    • (Top left to bottom right) Case Body +, hat +, solar, bottom inner plate +, fan holder.

    • Sunon Fan 5VDC

    • Solar panel 110x80

    • Tools (top-left to bottom right) : tin, soldering station, flat head screw driver, cable peeler, pliers glue gun (optional).

    • Cable double insulaton: +6 wires, 20 cm

  2. Sigrow Soil Pro + Assembly, Prepare cable solar panel to PCB: étape 2, image 1 de 3 Sigrow Soil Pro + Assembly, Prepare cable solar panel to PCB: étape 2, image 2 de 3 Sigrow Soil Pro + Assembly, Prepare cable solar panel to PCB: étape 2, image 3 de 3
    • Cable length is aprox 20-22 cm

    • Peel both ends, keep the non-peeled part short

    • Group them, twist and solder them together

    • On the opposite side you will only keep two colours: black and yellow

  3. Sigrow Soil Pro + Assembly, Solder cable solar panel: étape 3, image 1 de 3 Sigrow Soil Pro + Assembly, Solder cable solar panel: étape 3, image 2 de 3 Sigrow Soil Pro + Assembly, Solder cable solar panel: étape 3, image 3 de 3
    • Solder

    • Remove the plastic sheet

    • Slide solar panel in parasol

  4. Sigrow Soil Pro + Assembly, Fan mount: étape 4, image 1 de 1
    • Insert fan in fan holder

    • Pay attention to the fan air flow direction, it should be upwards

  5. Sigrow Soil Pro + Assembly, Peripherals: étape 5, image 1 de 2 Sigrow Soil Pro + Assembly, Peripherals: étape 5, image 2 de 2
    • From top to bottom:

    • Solar Panel mounted and with cable soldered (side with Sigrow letters)

    • Fan (cable enters from bottom)

    • Soil Sensor (cable enters from Sigrow 3 circles logo side)

  6. Sigrow Soil Pro + Assembly, Attach fan holder to main case+: étape 6, image 1 de 2 Sigrow Soil Pro + Assembly, Attach fan holder to main case+: étape 6, image 2 de 2
    • Fan holder should be inserted in main body case by pressure

    • If there's not a tight fit there are 2 options:

    • Option 1: Request a new fan holder

    • Option 2: Use the hot glue gun.

    • tight fit could be interpreted as: "if with very hard shaken the fan holder and main case will not disconnect and stay solidly attached.'

  7. Sigrow Soil Pro + Assembly, Bottom inner plate: étape 7, image 1 de 2 Sigrow Soil Pro + Assembly, Bottom inner plate: étape 7, image 2 de 2
    • Rectangular gap (for temperature humidity sensor) goes slightly in the left.

    • Bottom right tiny circular hole is for the fan cables

  8. Sigrow Soil Pro + Assembly, Confirm orientation: étape 8, image 1 de 2 Sigrow Soil Pro + Assembly, Confirm orientation: étape 8, image 2 de 2
    • Sigrow 3 circles side-> Soil Sensor

    • Letter side -> Solar panel

  9. Sigrow Soil Pro + Assembly, Soil Sensor connection: étape 9, image 1 de 3 Sigrow Soil Pro + Assembly, Soil Sensor connection: étape 9, image 2 de 3 Sigrow Soil Pro + Assembly, Soil Sensor connection: étape 9, image 3 de 3
    • Insert cables into connector, check in 3rd image in this step that the ports are open

    • Use pliers to cut white cable

  10. Sigrow Soil Pro + Assembly, Solder fan cables: étape 10, image 1 de 2 Sigrow Soil Pro + Assembly, Solder fan cables: étape 10, image 2 de 2
    • Black ground

    • Red positive

    • Cut with pliers cable excess from behind

  11. Sigrow Soil Pro + Assembly, Solder solar panel cables to pcb: étape 11, image 1 de 3 Sigrow Soil Pro + Assembly, Solder solar panel cables to pcb: étape 11, image 2 de 3 Sigrow Soil Pro + Assembly, Solder solar panel cables to pcb: étape 11, image 3 de 3
    • Cables enter from the back of the PCB

    • Yellow is positive

    • Black is negative (closer to the edge)

    • Cut with pliers cable and tin excess

    • Soldering station is very hot, dont touch it with your hands

  12. Sigrow Soil Pro + Assembly, Insert PCB in case - Cable details: étape 12, image 1 de 2 Sigrow Soil Pro + Assembly, Insert PCB in case - Cable details: étape 12, image 2 de 2
    • It's great to leave some extra cables in good shape

    • ~10 cm for the soil sensor bended as inverted-U

    • Twist the fan cable (it's very long) and bend as inverted-U

    • if PCB doesn't slide down with a gentle push or slides out too easy when case is upside down new case should be requested.

  13. Sigrow Soil Pro + Assembly, Closing the case: étape 13, image 1 de 2 Sigrow Soil Pro + Assembly, Closing the case: étape 13, image 2 de 2
    • After sliding PCB in, connect the solar parasol and the hat +

    • If the fit is not great inform Sigrow senior technician

  14. Sigrow Soil Pro + Assembly: étape 14, image 1 de 1
    • Congrats, you have completed a Soil Pro+

    • Please request from your Senior technician the latest packaging guidelines

Conclusion

In case of doubt contact manufacturing@sigrow.com

Sigrow

Membre depuis le 05/14/20

1 075 Réputation

5 tutoriels rédigés

Équipe

Sigrow Membre de l'équipe Sigrow

Community

3 membres

5 tutoriels rédigés

0 commentaires

Ajouter un commentaire

Nombre de vues :

Dernières 24 heures : 0

7 derniers jours : 1

30 derniers jours : 4

Total : 236