Modifications apportées à l'étape #1
Lignes de l'étape
[* red] Gently lift the black locking tabs and disconnect the 3 narrow ribbon cables. | |
- | [* black] On reassembly, after closing the locking tabs, pull gently on the ribbons. If they come out of the sockets then they weren't fully inserted. Fully inserting them can be a little fiddly, and tweezers can help. |
+ | [* black] On reassembly, after closing the locking tabs, pull gently on the ribbons. If they come out of the sockets then they weren't fully inserted. Fully inserting them can be a little fiddly, and [product|IF145-020|tweezers] can help. |
[* orange] Remove 5 screws labelled M2.5x5 on the mid plate. |