Modifications apportées à l'étape #3
Modifié par David Patierno —
- Avant
- Après
- Inchangé
Lignes de l'étape
[* black] Our first target was the pump. | |
- | [* icon_note] The pump is |
+ | [* icon_note] The pump is responsible for drawing water up from the reservoir to keep the boiler supplied with water... to boil. |
[* black] First, remove the two clear plastic hoses from the barb fittings on either end of the pump. | |
[* icon_note] When removing hoses from barb fittings, it is helpful to use a probe (the tip of a spudger in our case) to separate the hose from the metal fitting before pulling it off. | |
[* black] One hose is responsible for drawing water up from the reservoir and the other returns excess water if the boiler is filled to capacity. |