Aller au contenu principal

Modifications apportées à l'étape #9

Modifié par Bryan von Domitz

Modification rejetée par Andrew Optimus Goldheart

Avant
Après
Inchangé

Lignes de l'étape

[* icon_note] We will now focus on opening the heart of the Barista: the boiler.
[* black] Remove the four hex bolts securing the brew head to the boiler assembly.
[* black] Lift the brew head off the boiler.
[* black] Remove the single Phillips screw securing the brew screen and gasket to the boiler housing.
[* black] The brew screen helps to evenly disperse water across the grounds in the basket.
-[* black] Use a a large standard screwdriver (we used a washer and a pair of pliers) to remove the one-way valve spring retainer from the bottom of the boiler.
+[* black] Use a large standard screwdriver (we used a washer and a pair of pliers) to remove the one-way valve spring retainer from the bottom of the boiler.
[* icon_note] The one-way valve spring is tuned to only allow the valve to open when the pump is running. This prevents the brew head from dripping while warming up.