Modifications apportées à l'étape #10
Modifié par Andrew Bookholt —
- Avant
- Après
- Inchangé
Lignes de l'étape
[* black] Use a flat blade screwdriver to separate the two halves of the boiler. Inside the boiler, you can see the main components: | |
[* orange] Boiler housing (to contain water and steam). | |
[* green] Heater coil. | |
[* blue] Dual thermal sensors, presumably one to maintain steam temperature and one for max temperature shut down. | |
- | [* icon_note] The bottom portion of the boiler housing has a rigid hose reaching toward the top of the boiler to collect steam for brewing the coffee. |
+ | [* icon_note] The bottom portion of the boiler housing has a rigid hose reaching toward the top of the boiler presumably to collect steam for brewing the coffee. |
[* black] We are having trouble finding sources for the two Klixon thermal sensors. If anyone can find a source, we would greatly appreciate it. The numbers stamped around their bases are: | |
[* black] 1NT01L-0036 L95-10 9910 M 10/250~T200 | |
[* black] 1NT01L-0499 L127-15 9912 M 10/250~T200 |