Modifications apportées à l'étape #8
Modifié par Chris Mathe —
Modification approuvée par Chris Mathe
- Avant
- Après
- Inchangé
Lignes de l'étape
- | [* black] Connect the black (hot/power) wire from the ceiling to the black (labeled AC_IN L) wire on the receiver. |
---|---|
- | [* black] Connect the white (neutral) wire from the ceiling to the white (labeled AC_IN N) |
- | [* black] Gently tug |
+ | [* black] Connect the black (hot/power) wire from the ceiling junction box to the black wire (labeled AC_IN L) wire on the receiver. |
+ | [* black] Connect the white (neutral) wire from the ceiling junction box to the white wire (labeled AC_IN N) on the receiver. |
+ | [* black] Gently tug each wire to make sure the connection is properly terminated. |
[* black] Wrap each end with 15 cm of electrical tape. |