Modifications apportées à l'étape #6
Modifié par Dianxing Yang —
Modification approuvée par Dianxing Yang
- Avant
- Après
- Inchangé
Lignes de l'étape
[title] Opening the casing | |
- | [* orange] Remove and sort the front panel screws (×8) and the |
+ | [* orange] Remove and sort the front panel screws (×8) and the front paper cone full-range speaker screws (×4). After measuring the two screws are the same size both are round head and flat tip screws. |
[* blue] Screw diameter: 3mm | |
[* yellow] Thread length & Thread quantity: 9mm & 9 | |
[* red] Head diameter:5mm | |
[* green] Disconnect the top control panel from the right control panel |