Aller au contenu principal

Réparez vos affaires

Droit à la réparation

Pièces & Outils

Modifications apportées à l'étape #4

Modifié par bushing

Validation en attente

Supprimé
Ajouté
Inchangé

Lignes de l'étape

[* black] Carefully separate the two pieces by hand.
[* icon_reminder] Pay close attention to the orientationblue] The two shoulder buttons are made up of three pieces -- the rightplastic button, a pin, and left bumper pinsa spring. If they accidentally pop out while you are working, study the picture and springs. Installingmake sure you put the springsspring in the same manner as they were removed will cut down on reassembly time and frustrationcorrect position.
[* icon_cautionviolet] When puttingreassembling the top and bottom half back togethercover, make sure that the power switch cover on the bottom housing piececase is in the off (down) position. Otherwise, the power switch cover can break the very fragile power switch upon reassembly.
[* icon_reminder] Pay close attention to the orientationblue] The two shoulder buttons are made up of three pieces -- the rightplastic button, a pin, and left bumper pinsa spring. If they accidentally pop out while you are working, study the picture and springs. Installingmake sure you put the springsspring in the same manner as they were removed will cut down on reassembly time and frustrationcorrect position.
[* icon_cautionviolet] When puttingreassembling the top and bottom half back togethercover, make sure that the power switch cover on the bottom housing piececase is in the off (down) position. Otherwise, the power switch cover can break the very fragile power switch upon reassembly.

Image 1

Ancienne version

Nouvelle version

Image 2

Ancienne version

Nouvelle version

Image 3

Supprimé