Aller au contenu principal

Modifications apportées à l'étape #8

Modifié par Alexander Glenn

Modification approuvée par Alexander Glenn

Avant
Après
Inchangé

Lignes de l'étape

-[* red] Remove the two 7 mm screws indicated in red using a PH00 screwdriver. Forcibly pry the black rubber bracket from the white rail frame. This step causes a small metal bracket inside the rail frame to be dislodged; once this happens the black rubber bracket can be reattached, but the metal bracket cannot be put back into place.
+[* red] Remove the two 7 mm screws indicated in red using a PH00 screwdriver.
+[* black] Forcibly pry the black rubber bracket from the white rail frame. This step causes a small metal bracket inside the rail frame to be dislodged; once this happens the black rubber bracket can be reattached, but the metal bracket cannot be put back into place.
[* black] Complete this step for the black rubber bracket located on both the right and left sides of the rail adjustment.