Modifications apportées à l'étape #6
Modifié par Phillip Takahashi —
- Avant
- Après
- Inchangé
Lignes de l'étape
[* black] Lift and hold the upper pipe high enough to expose the plunger rod coupling. | |
- | [* black] Place one |
+ | [* black] Place one open end wrench over the lower portion of the plunger rod coupling. Hold this wrench steady. |
[* black] Place another wrench on the upper portion of the plunger rod coupling. Turn this wrench counterclockwise until the coupling separates. | |
- | [* black] Pull the upper pipe away from the pump. |
- | [* black] Lay the pipe on its side away from the pump. |
+ | [* black] Pull the upper pipe away from the pump and lay it on its side away from the pump. |
[* icon_note] Do not lay the pipe directly in grass or dirt, as you may get contaminants into the pipe that could obstruct water flow. |