Traduction de l’étape 10
Étape 10
-
Connecting the new panel replacement
-
Connect EDP cable. Make sure is fully seated and then flush EDP cable clear tape for adding adhesion to port.
-
make sure lock in cover is fully closed on edp cable as plugged in.
Vos contributions sont faites dans le cadre de la licence open source Creative Commons.