Traduction de l’étape 10
Étape 10
Upper shell - 2
-
Remove nine 8mm screws as follows:
-
Six from the back near the corners (either side of the battery bay).
-
Two from the sides.
-
One from near the circular vent.
-
Remove two 3mm screws from the battery bay.
Vos contributions sont faites dans le cadre de la licence open source Creative Commons.