Traduction de l’étape 1
Étape 1
Preparing and setting first strut channel
-
Clear large rocks from the streambed to make it easier to install the strut channel.
-
Set 5 ft steel strut channel into place.
-
Use the post pounder to drive the strut channel 3 ft into the stream bed.
Vos contributions sont faites dans le cadre de la licence open source Creative Commons.