Traduction de l’étape 2
Étape 2

Indicator Testing
-
The first was to test the front panel LED indicator to rule out stupidity, but I had a good idea it went well beyond an indicator light as the filter had not been getting dirty.
-
This was a simple test, touch a 9V battery in the correct polarity to the red and black wires coming off the HV board, the indicator should light up brightly, and it did.
Vos contributions sont faites dans le cadre de la licence open source Creative Commons.