Aller au contenu principal

Sontek IQ Flow Sensor Deployment

Anglais
Français

Traduction de l’étape 2

Étape 2
Sontek IQ Flow Sensor Deployment, Assembling the Node Box: étape 0, image 1 de 3 Sontek IQ Flow Sensor Deployment, Assembling the Node Box: étape 0, image 2 de 3 Sontek IQ Flow Sensor Deployment, Assembling the Node Box: étape 0, image 3 de 3
Assembling the Node Box
  • Wrap the Sontek connection wire to fit securely within the node box and without putting significant pressure on the standoffs

  • Insert the battery into the node box securely.

  • Connect the battery to the board just as in depth sensors and confirm that the sensor begins transmitting data to grafana.

  • The sensor starts as a "depth sensor" so only the battery voltage , data packets, and rsrp will be sent. It will take >10 minutes before flow and stage are taken and sent.

  • Place the board into the node box and secure it to the standoffs using screws. In the square node box it will only connect to 2 standoffs at a time.

Insérez ici votre traduction

Insérez ici votre traduction

Insérez ici votre traduction

Insérez ici votre traduction

Insérez ici votre traduction

Vos contributions sont faites dans le cadre de la licence open source Creative Commons.