Traduction de l’étape 12
Étape 12

'''LCD REMOVAL'''
-
Remove the two retaining screws on the bottom of the system.
-
M2.5 × 6 mm, wafer-head, nylon-coated (2)
-
Turn the system over and open the cover.
-
Unroute all the wires.
-
Remove the retaining screws.
-
M2.5 × 6 mm, wafer-head, nylon-coated (2)
-
Carefully lift the LCD panel up and out of the chass
Vos contributions sont faites dans le cadre de la licence open source Creative Commons.