Traduction de l’étape 5
Étape 5
Disassemble the Steam Chamber
-
The steam chamber contained two parts. The first part Mist Nozzle was screwed into the Mist Chimney with 2 screws (M3 x 0.5mm Phillips Head Screw) (*now missing)and the Mist Chimney onto the chamber with an additional 4 of the same screws. These connected parts directs the steam evenly up and through the sides of the steam chamber.
-
Mist Nozzle Length: 79mm
-
Mist Nozzle Height: 85mm
-
Screw head diameter: 5mm
-
Screw shaft length: 10mm
-
Mist Chimney Length: 125mm
-
Mist Chimney Height: 100mm
-
Mist Chimney Width: 50mm
Vos contributions sont faites dans le cadre de la licence open source Creative Commons.