Traduction de l’étape 3
Étape 3


-
Use an adjustable wrench to unscrew the connection tube between the pump and the boiler.
-
Pull off both tubes connecting on each side of the pump.
-
Remove the 3 electrical connectors from the pump.
Vos contributions sont faites dans le cadre de la licence open source Creative Commons.