Info : Vous modifiez un tutoriel prérequis. Toutes les modifications apportées affecteront les 3 tutoriels qui comprennent cette étape.
Traduction de l’étape 3
Étape 3
-
Have two people place C wrenches on the riser main on opposite sides of each other.
-
Have the two people with C-wrenches apply light upward pressure to the riser main while the base clamp operator loosens the clamp.
-
Lift the pipe evenly, not exceeding the comfortable lifting height of either lifter. Re-secure the base clamp once the maximum lifting height has been reached.
-
Lower the C-wrenches and repeat this step until the pipe coupling reaches the base clamp.
Vos contributions sont faites dans le cadre de la licence open source Creative Commons.