Aller au contenu principal

GeneralAire GA50A20 APS and PCB Replacement

Anglais
Français

Traduction de l’étape 3

Étape 3
GeneralAire GA50A20 APS and PCB Replacement, Transformer Testing: étape 0, image 1 de 1
Transformer Testing
  • Making sure the yellow and blue wires from the 24VAC transformer are off the HV board, clip on a volt meter and energize the unit with the front panel switch. I should have seen voltage there for about 5 seconds as the air proving switch turned on then off, but got nothing.

  • Turn off the 120VAC power switch.

  • Per the manual, I moved back to the air proving switch, a small board with a PTC thermistor and a triac that energize to provide 120VAC to transformer. With output lead 4 disconnected, connect he volt meter between pin 1 and 4.

  • Energize the unit once again. Still only a few 100mV. Carefully check that there is 120VAC on the incoming posts 2 & 3, yep it's there.

  • Turn off the 120VAC power once again.

Insérez ici votre traduction

Insérez ici votre traduction

Insérez ici votre traduction

Insérez ici votre traduction

Insérez ici votre traduction

Vos contributions sont faites dans le cadre de la licence open source Creative Commons.