Traduction de l’étape 3
Étape 3
-
Our first target was the pump.
-
First, remove the two clear plastic hoses from the barb fittings on either end of the pump.
-
One hose is responsible for drawing water up from the reservoir and the other returns excess water if the boiler is filled to capacity and reaches the preset pressure of the pressure release valve.
Vos contributions sont faites dans le cadre de la licence open source Creative Commons.