Traduction de l’étape 13
Étape 13

Reinstall the right circuit board
-
Once all the switches on the board have been replaced cut off excess lead length from the new switches.
-
Reinstall the board and screw it down.
-
Press each button one more time and listen for the click.
Vos contributions sont faites dans le cadre de la licence open source Creative Commons.