Modifications apportées à l'étape #25
Modifié par Ian Thompson —
Modification approuvée par Carsten Frauenheim
- Avant
- Après
- Inchangé
Lignes de l'étape
[title] Preparing Node Handle pt. 2 | |
[* violet] insert the two 5/16" strut channel nuts into the back of the horizontal strut channel as shown | |
[* red] screw the two 5/16" hex bolts (using the two washers) to the strut channel nuts | |
- | [* icon_note] the depth node will be attached to these two hex bolts; skip this for now if your node is ready to be attached |