Aller au contenu principal

Modifications apportées à l'étape #24

Modifié par Gregg Ferry

Modification approuvée par Gregg Ferry

Avant
Après
Inchangé

Lignes de l'étape

+[* black] The orange wire needs to connect the the - of “b.Battery”, too. Push the thin blue and thin orange wire through the carrier. This is a good time to push the temperature sensor on the green wires into the carrier.
+[* black] Trim and tin both the orange and blue wires Put a 2cm length of heat shrink over each of the orange and blue wires. Cut the - lead of the “b. Battery” leaving about 3cm
+[* black] Strip 2cm of the lead and tin. Wrap the tinned lead 360° around the fuse lead, leaving a bit for the orange wire. Crimp the fuse lead Create a U on the “bit” of lead. Create a U on the orange wire Loop the U’s together, crimp with needle nose pliers and solder both joints, remembering not to dwell on the fuse lead 038

Image 1

Aucune image précédente

Ajouté

Image 2

Aucune image précédente

Ajouté

Image 3

Aucune image précédente

Ajouté