Modifications apportées à l'étape #4
Modifié par Roger Clark —
Modification approuvée par Roger Clark
- Avant
- Après
- Inchangé
Lignes de l'étape
+ | [title] Debugging |
---|---|
+ | [* black] At this point, I had three suspects, the transformer, the air proving switch, and after closer inspection, I saw a brown discoloration on one of the high voltage capacitors. |
+ | [* black] I decided to start with the transformer. After removing it from the unit, I checked the secondary and measured about 7 Ohm, reasonable. The primary was open, just to make sure I slowly opened the primary coil and after getting back to the winding, didn't see anything obvious, but it was still measuring open. |
+ | [* black] On removing the air proving switch, the thermistor checked out at about 1kOhms and responded with a squirt of canned air. All the discretes checked out except for the triac. |
Image 1
Aucune image précédente
Ajouté