Aller au contenu principal

Modifications apportées à l'étape #8

Modifié par Roger Clark

Modification approuvée par Roger Clark

Avant
Après
Inchangé

Lignes de l'étape

+[title] Final Testing
+[* black] Reverse the order of testing:
+ [* black] Connect the air proving switch and verify voltage at pins 1 & 4.
+ [* black] Connect the transformer and verify 24VAC out when energized and the air proving switch is cold.
+[* icon_caution] DO NOT USE OR MEASURE THE HIGH VOLTAGE BOARD WITH ANYTHING OTHER THAN NON CONTACT VOLTAGE PROBE.
+[* black] With everything connected, powered up the unit and watched the indicator come on and go off. I turned on the fan to the air unit and the indicator came back on and very carefully bringing the voltage probe near the HV lines, I got some nice chirping.