Modifications apportées à l'étape #2
Modifié par Meagan Tobias —
Modification approuvée par Meagan Tobias
- Avant
- Après
- Inchangé
Lignes de l'étape
[title] Assembling the Node Box | |
[* red] Wrap the Sontek connection wire around the outside of the stand-offs. | |
[* orange] Insert the battery into the node box in the center. | |
[* violet] Connect the battery to the board and confirm that the sensor begins transmitting data to grafana. | |
- | [* yellow] Place the board into the node box and secure it to the offsets using screws. |
+ | [* icon_note] The sensor starts as a "depth sensor" so only the battery voltage will be sent. It will take >10 minutes before proper measurements are taken and sent. |
+ | [* yellow] Place the board into the node box and secure it to the standoffs using screws. (Does not have to connect to all 4 standoffs) |