Aller au contenu principal

Modifications apportées à l'étape #2

Modifié par Meagan Tobias

Modification approuvée par Meagan Tobias

Avant
Après
Inchangé

Lignes de l'étape

[title] Assembling the Node Box
[* red] Wrap the Sontek connection wire around the outside of the stand-offs.
[* orange] Insert the battery into the node box in the center.
[* violet] Connect the battery to the board and confirm that the sensor begins transmitting data to grafana.
-[* yellow] Place the board into the node box and secure it to the offsets using screws.
+[* icon_note] The sensor starts as a "depth sensor" so only the battery voltage will be sent. It will take >10 minutes before proper measurements are taken and sent.
+[* yellow] Place the board into the node box and secure it to the standoffs using screws. (Does not have to connect to all 4 standoffs)