Aller au contenu principal

Modifications apportées à l'étape #13

Modifié par Gina Kittleson

Modification approuvée par Gina Kittleson

Avant
Après
Inchangé

Lignes de l'étape

[title] Fit the boards into the node box
[* red] Slide the open storm board into the node box on the right pushed up as close to the ports as possible.
[* orange] Slide the 3-4V battery into the enclosure on the left side.
[* yellow] Carefully fold the connected relay board over so that it fits within the enclosure snuggly.
[* green] Check to make sure that the connections remained secure.
-[* light_blue] Plug the 6 pin connector into the port on the open storm board.
+[* light_blue] Plug the 6 pin connector into the port on the open storm board that is the second from the left side of the board in the image near the SD card port.
[* violet] Check that the battery port is exposed for deployment, but do not plug in the battery until the sampler is ready to begin sampling.