Modifications apportées à l'étape #5
Lignes de l'étape
[title] Disassemble the Steam Chamber | |
- | [* black] The steam chamber contained two parts. The first part (filter thing) was |
+ | [* black] The steam chamber contained two parts. The first part (filter thing) was screwed into the funnel thing with 2 screws and the (funnel thing) with an additional 4 of the same screws was screwed into the chamber. |
[* yellow] Length: 79mm | |
[* red] Height: 85mm | |
[* green] Screw head diameter and shaft length: 5mm x 10mm | |
[* light_blue] Length: 125mm | |
[* violet] Height: 100mm |