Aller au contenu principal

Modifications apportées à l'étape #5

Modifié par Anooja V

Modification approuvée par Anooja V

Avant
Après
Inchangé

Lignes de l'étape

[title] Disassemble the Steam Chamber
[* black] The steam chamber contained two parts. The first part (filter thing) was screwed into the funnel thing with 2 screws and the (funnel thing) with an additional 4 of the same screws was screwed into the chamber.
[* yellow] Length: 79mm
[* red] Height: 85mm
+[* orange] Screw head diameter: 5mm
[* green] Screw shaft length: 10mm
-[* orange] Screw head diameter: 5mm
[* light_blue] Length: 125mm
[* violet] Height: 100mm