Modifications apportées à l'étape #3
Modifié par Tanya Malalang —
- Avant
- Après
- Inchangé
Lignes de l'étape
- | [* green] Remove the two screws that are closer to the top and bottom edges of the camera. The screws have |
---|---|
- | [* violet] Remove the two screws on either side of the strap base. The screws have these measurements |
+ | [* green] Remove the two screws that are closer to the top and bottom edges of the camera. The screws have these measurements: 2.5mm head and 3.15mm length. |
+ | [* violet] Remove the two screws on either side of the strap base. The screws have these measurements: 2.5mm head and 3.75mm length. |