Aller au contenu principal

Modifications apportées à l'étape #4

Modifié par Miroslav Djuric

Validation en attente

Avant
Après
Inchangé

Lignes de l'étape

[* black] All three antennas need to be removed before accessing the hardware underneath.
-[* black] There are two black posts securing each Airport antenna board to the internal frame.
-[* black] To remove each antenna, squeeze both black posts together and gently lift the antenna board from the post.
+[* icon_note] Two black posts secure the large Airport antenna board to the internal frame. The other two antennas (on the right) can be removed by pulling them directly upward.
+[* black] Remove the large antenna by squeezing both black posts together and gently lifting the antenna board from the posts.
+[* black] Remove the other two antennas by pulling them directly upward.