Aller au contenu principal

Garmin Avionics Wiring Termination

Anglais
Français

Traduction de l’étape 7

Étape 7
Garmin Avionics Wiring Termination, Shielding termination: étape 0, image 1 de 2 Garmin Avionics Wiring Termination, Shielding termination: étape 0, image 2 de 2
Shielding termination
  • Insert the environmental splice over the cut shielding block and insert the shield braid into it. The solder ring must go over both the exposed shield and the braid.

  • Insert a piece of heat shrink over the end of the wire where the shield and outer insulation is cut. This will protect the end of the wire

  • Heat the splice and heat-shrink with a heat gun. Ensure the solder flows in the splice soldering the braid to the shield.

Insérez ici votre traduction

Insérez ici votre traduction

Insérez ici votre traduction

Vos contributions sont faites dans le cadre de la licence open source Creative Commons.