Aller au contenu principal

India Mark II Foot Valve Assembly Replacement

Anglais
Français

Traduction de l’étape 3

Étape 3
India Mark II Foot Valve Assembly Replacement: étape 0, image 1 de 1
  • After reassembling the pump cylinder, test it by moving the valve up and down in a bucket of water to make sure all components were reinstalled properly.

  • Water should flow out the top of the pump on the upward stroke of the valve and no water should push through the bottom of the pump on the down stroke.

Insérez ici votre traduction

Insérez ici votre traduction

Vos contributions sont faites dans le cadre de la licence open source Creative Commons.